Home - Projects - Previous Projects
NATO U.S. Army Garrison (USAG) Brussels Tie Cable – Kingdom of Belgium

U.S. Air Force Emergency Mass Notification System (EMNS)
EPS engineered, furnished, installed, and tested (EFI&T) a fiber optic backbone link within the Kingdom of Belgium, from NATO Headquarters in Brussels, Belgium to the U.S. Army Garrison (USAG) Brussels the project included:
- Obtaining all necessary permits, licenses and approvals from local Belgium government to perform the work.
- Coordinated all engineering, implementation and testing with the Government Installation Coordinator, local Director of Engineering and Housing (Directorate of Public Works (DPW)), and local Signal Battalion
- Performing pre-survey and final survey and obtained COR approval of the proposed cable routes.
- 2 Kilometers of trenching and installing conduit and manhole system
- Installed and tested 2.8 kilometers of 24 Strand G655 SM fiber optic cable.
- After Acceptance provide 36 months providing monthly Cable Plant Administration Reports to the COR that describe all inquiries and responses concerning the EPS-furnished fiber optic link.

